Establishing of a drinking water purification station
for Al-Ajfar and turbah
Key Stages of Building a Drinking Water Treatment Plant (Simplified)
Earthworks:
Conduct site survey and assessment.
Clear the site and level the ground.
Perform excavation, backfilling, and foundation preparation.
Civil and Structural Works:
Construct concrete foundations and structural frameworks.
Build sedimentation tanks, filtration basins, and storage reservoirs.
Construct administrative buildings and supporting facilities.
Electromechanical Works:
Install pumps, pipelines, and valves.
Set up mechanical equipment (mixers, dosing systems).
Install electrical and control systems (SCADA).
Water Treatment Processes:
Intake raw water through intake structures.
Perform filtration, sedimentation, and disinfection (chlorination/UV).
Conduct final water quality adjustments and treatment.
Evaporation Ponds and Sludge Management:
Build evaporation ponds for brine disposal.
Install sludge dewatering and drying systems.
Testing and Commissioning:
Test pipelines, pumps, and treatment processes.
Train staff for operation and maintenance.
Deliver the plant fully operational.
Finalization:
Restore the site with landscaping.
Install security systems (fencing, surveillance).
Outcome
A state-of-the-art treatment plant ensuring the delivery of high-quality, safe drinking water to meet community needs